Chevrolet Bolt EV: 500 Miles in Winter Conditions

From News Coulomb.

This video is the final leg of my trip back from the LA Auto Show. For this route, I decided to return through the Eastern Sierras, with temperatures down into the low teens. Because I started early in the day and high in elevation, it was a fairly relaxed return home, so I used the time to check out some additional chargers along the way.

Chargers used on this trip:

Lee Vining, Gus Hess Park: https://www.plugshare.com/location/192854
Bridgeport, Electrify America: https://www.plugshare.com/location/191333
Donner Pass Westbound Rest Area, CalTrans: https://www.plugshare.com/location/303849
76 Rocklin, EV Connect: https://www.plugshare.com/location/480280
Chevron Main+, Market Freewire EV Connect: https://www.plugshare.com/location/470242
Dunnigan, ChargePoint: https://www.plugshare.com/location/187883
Dunnigan, Electrify America: https://www.plugshare.com/location/163284