From Munro Live.
Need reliable EV charging without waiting months for grid upgrades? The Volt Vault by U.S. Energy is a portable, off-grid EV charging solution designed to power fleets, remote worksites, and heavy-duty electric trucks—anywhere, anytime.
Unlike traditional EV charging infrastructure that can take 9–24 months to install, Volt Vault can be deployed in as little as 4 months. With options for Level 2 and Level 3 charging, it’s perfect for fleet operators, logistics hubs, and temporary or hard-to-reach locations.
Disclaimer: Chris Thomas is a board member at U.S. Venture, the company behind Volt Vault.
Munro Live is a YouTube channel that features Sandy Munro and other engineers from Munro & Associates. Munro is an engineering consulting firm and a world leader in reverse engineering, costing, and teardown benchmarking.
Munro Home of Lean Design
We would really appreciate it if you subscribe to our channel. The more subscribers we have, the more opportunities and teardowns we will be able to bring to you!
For more behind the scenes content:
X/Twitter: https://twitter.com/live_munro
Instagram: https://www.instagram.com/munrolive
LinkedIn: https://www.linkedin.com/company/munro-live
Munro Live Podcast: https://www.youtube.com/@munrolivepodcast
Inquiries: Sales@leandesign.com
For Exclusive Content Join our Patreon!
Patreon: https://www.patreon.com/MunroLive