Giga Texas Grand Tour & Major Construction Project Flight 1 June 2026 in 4K

From Joe Tegtmeyer.

While I’m traveling to Europe for the Austria Tesla Club Takeover Europe event, I thought I’d publish a video I just completed giving a grand tour of the entire site, concentrating on where all major construction projects (current and future) are located around the expansive property to help put into context where everything is located in reference to the main factory building and how the overall site is transforming right before out eyes!

Much of the big interest items that will be talked about in late 2027 and into 2028 are under construction here now! I hope this grand tour also helps to show how long the lead times are for major construction, equipping, training and then starting initial production ahead of ramping to scale.

This is a multi year effort and shows the kind of foresight required when attempting new and disruptive processes, products or production methods.

Join me as we fly around much of the site today!

Leave a Reply

Your email address will not be published. Required fields are marked *