From Out of Spec Podcast.
Walter sits down with Landon, “The Arkansas eTraveler,” to discuss how Walmart is racing to build a nationwide DC fast charging network. In this episode, we cover the latest updates on permits, construction progress, and time-of-use pricing. If you’re tracking Walmart’s EV charging rollout, this episode breaks down what’s open, what’s coming, and what it means for EV drivers.
Thank you @TheArkansaseTraveler for joining!
Landon on YouTube: @TheArkansaseTraveler
Landon on X: @TheArkeTraveler
Rivian Referral Code: https://rivian.com/configurations/list?reprCode=KYLE1997381
Tesla Referral Code: https://ts.la/kyle92049
Join our Discord: https://discord.gg/rugePTuzU4
For further inquiries please email info@outofspecstudios.com
00:00 – Intro & Guest
02:22 – Walmart DCFC Project
07:30 – Station Design
15:09 – Pricing & Time-of-Use
21:18 – Outlook & Permits
25:40 – Wrap-up & Outro
#walmart #dcfc #charging #ev


