Hardware Mix: Testing Tritium at bp pulse Boston Gigahub | Quick Charge # 24 EVsoup / April 15, 2026 From Plug and Play EV. Join us for a quick (long) charge session in the 2017 Bolt EV, looking at bp pulse spring savings, the role of Gigahubs in bp’s DCFC mix, and the limitations of this otherwise well-situated fast-charging hub near Boston’s Logan Airport. PlugShare URL – https://www.plugshare.com/location/711816 bp pulse Network Stats – https://dcfctracker.com/?networks=BP_PULSE